Mission Avenue Transmission Main
Halme Construction has completed a contract with the City of Spokane to install a 30" Ductile Iron transmission main from Hamilton St to Greene St along with water distibution pipe replacement. Full curb to curb reconstruction was completed from Perry to Greene St. Arc Electric provided the signal work, Shamrock Paving completed the HMA and Five Star Concrete poured the curb and walk. Sharpline Industries provided the signs and striping.