Miles-Creston Road
Halme Construction has completed this contract to reconstruct 7 miles of county roadway for Lincoln County. This project includes over 320,000 CY of Roadway Excavation along with 40,000 CY of Crushed Surfacing placement. and about 3,500 LF of culvert pipe in various sizes. Also included in the project is 30,000 LF of Line Shot Blasting performed by North Idaho Drilling and Hard Surfacing performed by Granite Northwest. Frank Gurney Inc. installed 3.5 miles of guardrail down the steep grade. 