Spokane County Regional Wastewater Facility
Halme Construction worked as a subcontractor to CH2MHill Constructors performing earthwork and yard piping for this 8 million gallon per day facility. Halme installed over 40,000 LF of yard pipe ranging from 2" to 60" diameter. There was also large excavations up to 35' in depth for the many concrete structures involved in this job to add to the maze of piping.
HD Fowler Co. along with U.S. Pipe supplied the majority of the pipe and fittings used by Halme on this project.
Halme also performed on-site electrical trenching for Power City Electric, building excavation work for Garco Construction, and mechanical excavations for University Mechanical throughout this project.