Infrastructure Improvements Grant County Fairgrounds
This project consisted of about 17,000 LF of water pipe to provide a new potable and irrigation water system for the fairgrounds. Also included was a booster pump station. Halme installed 5 high capacity on-site septic systems, complete with infiltration beds, pump chambers and high capacity precast concrete tanks. A new electrical system providing lighting and RV hookups was also installed using Northeast Electric as the electrical subcontractor. Paving for this work was completed by Central Washington Asphalt and concrete path work was performed by Five Star Concrete.